The Procurement Strategies for the Olympic Stadium and the Aquatic Centre for the London 2012 Olympic Games - Dirk Von Plessen - Libros - diplom.de - 9783956366956 - 25 de septiembre de 2014
En caso de que portada y título no coincidan, el título será el correcto

The Procurement Strategies for the Olympic Stadium and the Aquatic Centre for the London 2012 Olympic Games

Precio
$ 34,99
sin IVA

Pedido desde almacén remoto

Entrega prevista 25 de jun. - 8 de jul.
Añadir a tu lista de deseos de iMusic

Master's Thesis from the year 2009 in the subject Engineering - Metal Engineering / Metal Processing / Metal Structure, grade: A, Kingston University London, language: English, abstract: The study aims to determine [hypothesis] whether the procurement strategies chosen by the ODA (Olympic Delivery Authority) are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality. In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park. As a main part of this analysis the author will conduct semi- structured interviews with key people involved in the Olympics and with experts of ?the industry. Both the literature review and the interviews will help to achieve the main research objectives of this study, which are summarised below: ? Obtain a better understanding of construction procurement and the key areas affecting the project success ? Identify best practice in selecting a procurement method and to make out the pitfalls and the shortcomings of the procurement strategies that are used for both venues ? Understand why these procurement decisions were made and identify if best practice was followed by the ODA during its procurement process and if the pitfalls of the chosen strategies were counteracted ? Determine if the chosen procurement strategies fit the client & the project

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 25 de septiembre de 2014
ISBN13 9783956366956
Editores diplom.de
Páginas 120
Dimensiones 148 × 210 × 7 mm   ·   167 g
Lengua Inglés  

Mas por Dirk Von Plessen

Mostrar todo

Mere med samme udgiver