Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) - The Law Library - Libros - Createspace Independent Publishing Platf - 9781727888607 - 16 de octubre de 2018
En caso de que portada y título no coincidan, el título será el correcto

Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Precio
$ 25,99
sin IVA

Pedido desde almacén remoto

Entrega prevista 19 de jun. - 8 de jul.
Añadir a tu lista de deseos de iMusic

Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Federal Energy Regulatory Commission is revising its regulations to improve transparency practices for regional transmission organizations (RTO) and independent system operators (ISO). The Commission requires that each RTO/ISO establish in its tariff: Requirements to report, on a monthly basis, total uplift payments for each transmission zone, broken out by day and uplift category; requirements to report, on a monthly basis, total uplift payments for each resource; requirements to report, on a monthly basis, for each operator-initiated commitment, the size of the commitment, transmission zone, commitment reason, and commitment start time; and the transmission constraint penalty factors used in its market software, as well as the circumstances under which those factors can set locational marginal prices, and any process by which they can be changed. The Commission is withdrawing its proposal to require that each RTO/ISO that currently allocates the costs of real-time uplift to deviations allocate such real-time uplift costs only to those market participants whose transactions are reasonably expected to have caused the real-time uplift costs. This book contains: - The complete text of the Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 16 de octubre de 2018
ISBN13 9781727888607
Editores Createspace Independent Publishing Platf
Páginas 58
Dimensiones 178 × 254 × 3 mm   ·   117 g
Lengua Inglés  

Mas por The Law Library

Mostrar todo