Final Approval of the Minnesota Infrastructure SIP Requirements for the Ozone, NO2, SO2, and PM2.5 NAAQS (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - The Law Library - Libros - Createspace Independent Publishing Platf - 9781723488245 - 20 de julio de 2018
En caso de que portada y título no coincidan, el título será el correcto

Final Approval of the Minnesota Infrastructure SIP Requirements for the Ozone, NO2, SO2, and PM2.5 NAAQS (US Environmental Protection Agency Regulation) (EPA) (2018 Edition)

Precio
$ 25,99
sin IVA

Pedido desde almacén remoto

Entrega prevista 19 de jun. - 8 de jul.
Añadir a tu lista de deseos de iMusic

Final Approval of the Minnesota Infrastructure SIP Requirements for the Ozone, NO2, SO2, and PM2.5 NAAQS (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Final Approval of the Minnesota Infrastructure SIP Requirements for the Ozone, NO2, SO2, and PM2.5 NAAQS (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is taking final action to approve some elements and disapprove other elements of state implementation plan (SIP) submissions from Minnesota regarding the infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 2008 ozone, 2010 nitrogen dioxide (NO 2), 2010 sulfur dioxide (SO 2), and 2012 fine particulate matter (PM 2.5) National Ambient Air Quality Standards (NAAQS). The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. EPA is disapproving certain elements of Minnesota's submissions relating to Prevention of Significant Deterioration (PSD) requirements. Minnesota already administers Federally promulgated regulations that address the disapprovals described in this rulemaking. Therefore, the state is not obligated to submit any new or additional regulations as a result of this disapproval. The proposed rulemaking associated with this final action was published on June 26, 2015, and EPA received one comment letter during the comment period, which ended on July 27, 2015. This book contains: - The complete text of the Final Approval of the Minnesota Infrastructure SIP Requirements for the Ozone, NO2, SO2, and PM2.5 NAAQS (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 20 de julio de 2018
ISBN13 9781723488245
Editores Createspace Independent Publishing Platf
Páginas 44
Dimensiones 178 × 254 × 2 mm   ·   95 g
Lengua Inglés  

Mas por The Law Library

Mostrar todo