Recomienda este artículo a tus amigos:
Airdrop of Supplies and Equipment: Rigging Airborne Crane-shovel and Attachments (Fm 10-548 / to 13c7-24-21) Department of the Air Force
Airdrop of Supplies and Equipment: Rigging Airborne Crane-shovel and Attachments (Fm 10-548 / to 13c7-24-21)
Department of the Air Force
This manual is designed for use by all parachute riggers. It tells and shows how to rig the following cranes: a) The 7-Ton Airborne Crane-Shovel. The 7-ton airborne crane-shovel is rigged for low-velocity airdrop from a C-130 or a C-141 aircraft, b) The 3/8- Cubic Yard Crane-Shovel Attachments. The 3/8-cubic yard crane-shovel attachments are rigged for low-velocity airdrop from a C-130 or a C-141 aircraft, c) The Koehring 7 ½-Ton Crane. The Koehring 7 ½-ton crane is rigged for low-velocity airdrop from C-130 or a C-141 aircraft. It is also rigged for LAPE airdrop from a C-130 aircraft.
| Medios de comunicación | Libros Paperback Book (Libro con tapa blanda y lomo encolado) |
| Publicado | 12 de noviembre de 2012 |
| ISBN13 | 9781481002578 |
| Editores | CreateSpace Independent Publishing Platf |
| Páginas | 88 |
| Dimensiones | 213 × 5 × 275 mm · 231 g |
| Lengua | Inglés |
Mas por Department of the Air Force
Mostrar todoVer todo de Department of the Air Force ( Ej. Paperback Book )